Extension Phase 3
Thumbnail View
New drain pipes
Flat roof insulation
The last part of the old back door
The old water main
The new one (temporarily anyway)
New garage space
That patch of new concrete is where the old oil tank was
Two new platforms for the oil tank and new external boiler
The main steel beam has been joined together
Kitchen roof
Study roof
The final rain water drain
View from upstairs
Looking down on the opened garage door
< Previous Page<<< First Page
12345678910
Last Page >>>Next Page >
Extension page