Extension Phase 3 |
---|
Thumbnail View |
 |
New drain pipes |
 |
Flat roof insulation |
 |
|
 |
The last part of the old back door |
 |
The old water main |
 |
The new one (temporarily anyway) |
 |
New garage space |
 |
That patch of new concrete is where the old oil tank was |
 |
Two new platforms for the oil tank and new external boiler |
 |
The main steel beam has been joined together |
 |
Kitchen roof |
 |
|
 |
Study roof |
 |
The final rain water drain |
 |
|
 |
View from upstairs |
 |
Looking down on the opened garage door |