Extension Phase 3
Fullsize View

View from the dressing room to the ensuite

To the master bedroom

The new corridor wall towards the new bedrooms, with the ensuite to the left

The single story roof



Start of the new utility room wall



The steel beam is being put in place



Half of it at least

Old cloakroom with the down pipe that is being diverted.

A slight projection into the front room.
< Previous Page<<< First Page
12345678910
Last Page >>>Next Page >
Extension page