Extension Phase 3
Fullsize View

New drain pipes

Flat roof insulation


The last part of the old back door

The old water main

The new one (temporarily anyway)

New garage space

That patch of new concrete is where the old oil tank was

Two new platforms for the oil tank and new external boiler

The main steel beam has been joined together

Kitchen roof


Study roof

The final rain water drain


View from upstairs

Looking down on the opened garage door
 
< Previous Page<<< First Page
12345678910
Last Page >>>Next Page >
Extension page