Episode 7 - Return of the drains |
The water main has now been moved to it's new position in the garage, and the trenches are being dug for the final drain which is for the new soil pipe. The garage floor that was part oil tank space and part utility room is being filled in and, despite some earlier concerns, we have discovered that the whole floor from front to back is at the same level. Click Here for photographs |
<< Return to the zort.co.uk home page |