Episode 7 - Return of the drains
Lots of things are happening now, the scaffolding has been completely removed. The guttering for all the pitched roofs is now complete and just for a change another drain has been installed for the front gutters.

The water main has now been moved to it's new position in the garage, and the trenches are being dug for the final drain which is for the new soil pipe.

The garage floor that was part oil tank space and part utility room is being filled in and, despite some earlier concerns, we have discovered that the whole floor from front to back is at the same level.

Click Here for photographs
<< Return to the zort.co.uk home page