First fix |
Page 1 The new rear garage door is fitted, the old kitchen doorway is bricked up, the old kitchen floor starts to be dug up and the rear wall of the house is removed ! Page 2 We have a movable temporary kitchen, the first fix plumbing is started, with the new waste pipe put in place following a rollercoaster route out. Page 3 Hardcore and concrete are added back in to the old kitchen floor, more first fix plumbing Page 4 Yet more plumbing, the electrics are started, and the wall for the downstairs cloakroom is started. |
<< Return to the zort.co.uk home page |