First fix
Lots of updates and pgotographs from the last week, click on each page link or just click on the first one and view them from the start.

Page 1 The new rear garage door is fitted, the old kitchen doorway is bricked up, the old kitchen floor starts to be dug up and the rear wall of the house is removed !

Page 2 We have a movable temporary kitchen, the first fix plumbing is started, with the new waste pipe put in place following a rollercoaster route out.

Page 3 Hardcore and concrete are added back in to the old kitchen floor, more first fix plumbing

Page 4 Yet more plumbing, the electrics are started, and the wall for the downstairs cloakroom is started.